220kV氧化锌避雷器不拆引线试验方法

周洋   

  1. 河北华电混合蓄能水电有限公司,河北石家庄050000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-11-25 发布日期:2012-11-25

Test method of 220kV zinc oxide arrester without need to demolish lead wires

ZHOU Yang   

  1. Hebei Huadian Mixed Energy Storage Hydropower Company Limited, Shijiazhuang 050000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-11-25 Published:2012-11-25

摘要: 由于220kV金属氧化锌避雷器(MOA)安装的对地距离比较高,在检修预试时拆除引线的工作量比较大且存在一定风险。研究了一种不拆引线的试验方法,可减少工作强度、缩短工作时间,降低人员、设备的风险。对220kV MOA不拆引线方法的理论可行性和实测数据进行了分析,认为MOA不拆引线与拆除引线的实测数据具有可比性,能够满足规程要求。

关键词: 氧化锌避雷器, 检修预试, 不拆引线, 漏电流, 可行性

Abstract: For the install position of the 220kV metal zinc oxide arrester (MOA) is higher from the earth, in maintenance and preliminary test of MOA, larger amount of work must be spent to demolish the lead wires and this causes certain risk. A new test method was developed, in which to demolish the lead wires is not needed. To use the new method can lighten working strength, shorten working time and reduce the risk of persons and equipments. The theoretical feasibility and practically measured data of the new test method used in test of 220kV MOA were analyzed; and the analysis shows that the practically data of the MOA measured by the new method is comparable with the data measured by original method, in which the lead wires of MOA must be demolished; and the new test method can satisfy the requirement of relative regulations.

Key words: metal zinc oxide arrester, maintenance and preliminary test, without need to demolish lead wires, current leakage, feasibility