华电技术 ›› 2012, Vol. 34 ›› Issue (2): 75-76.
• 节能与环保 • 上一篇
徐斌,田利娟,陶爱平
收稿日期:
修回日期:
出版日期:
XU Bin, TIAN Lijuan, TAO Aiping
Received:
Revised:
Published:
摘要: 分析了简化脱硫系统配置,优化主要设备选型,增加防腐、防磨措施的可行性,论述了取消烟气旁路后保证脱硫装置可靠性的措施,供烟气脱硫系统设备配置与选型时参考。
关键词: 湿法脱硫, 烟气换热器, 无旁路, 烟塔合一, 设备配置, 选型
Abstract: The feasibility of simplifing the desulphurization system configuration, optimizing the main equipments selection and adding anticorrosion and antiabrasion measures were analyzed. The measures for ensuring the reliability of desulphurization equipments after eliminating the flue gas bypass were expounded, which can be used as reference for FGD system in equipment configuration and selection.
Key words: wet desulphurization, gas-gas heater (GGH), without bypass, cooling water in place of chimney combining tower, equipment configuration, type selection
徐斌;田利娟;陶爱平. 燃煤电厂无旁路湿法烟气脱硫系统设备配置与选型[J]. 华电技术, 2012, 34(2): 75-76.
XU Bin;TIAN Lijuan;TAO Aiping. Configuration and type selection of equipments for wet FGD system without bypass in coalfired power plants[J]. Huadian Technology, 2012, 34(2): 75-76.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.hdpower.net/CN/
https://www.hdpower.net/CN/Y2012/V34/I2/75