摘要: 大唐国际陡河发电厂 #3, #4锅炉输灰系统在实际运行中出现了系统稳定性差、系统缺陷频发、电除尘器高料位、系统磨损严重、压缩空气裕量不足等问题。对出现的问题进行了分析,提出了解决办法。

关键词: 正压浓相气力输灰, 煤质变化, 原因分析, 设备改造, 解决办法

Abstract: Some problems occurred in practical operation of the ash conveying system of boilers No.3 and No.4 in Datang International Douhe Power Plant, which include that the system stability is poor, the system defects occurred frequently, the material level of the electrostatic precipitator is higher, the wear of the system is serious, the allowance of the pressured air is insufficient and others. The problems were analyzed ,and the solving methods were proposed.