摘要: 摘要:北方某地区突降大雪,导致源安Ⅰ线和源霸2条线路跳闸,仅剩源安Ⅱ线运行,保留 #4机组、 #8机组300MW负荷运行。托电公司迅速组织骨干力量,启动应急预案,采取了有效的防范措施,以确保剩余机组的安全、稳定运行。
关键词: 关键词:“一一·五”事件, 电网线路故障, 防范措施
Abstract: Abstract:A heavy snow suddenly occurred in a north region, and this caused the transmission line tripout accidents of YuanAn Line I and two YuanBa lines. Only the YuanAn Line II remained in working condition, and the unit No.4 and unit No.8 still were operating with 300MW load. Togtoh Power Generation Company Limited quickly organized related professionals, started the emergency plan, and adopted effective preventive measures, which ensured the remained units to operate safely and stably.
Key words: Key words:“11.5” accident, power grid line fault, preventive measure
陈磊,王凯民,龙俊峰. 电网线路故障处理热控防范措施[J]. 华电技术, 2013, 35(10): 74-75.
CHEN Lei, WANG Kaimin, LONG Junfeng. Preventive measures of thermal control system during power grid line fault treatment[J]. Huadian Technology, 2013, 35(10): 74-75.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.hdpower.net/CN/
https://www.hdpower.net/CN/Y2013/V35/I10/74