华电技术 ›› 2013, Vol. 35 ›› Issue (4): 69-71.

• 新能源 • 上一篇    下一篇

AP1000与M310改进型压水堆二回路给水系统比较分析

成军,杨建军   

  1. (中国核电工程有限公司河北分公司,河北石家庄050021)
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2013-04-25 发布日期:2013-04-25

Comparative analysis on feedwater systems in secondary loop of pressurized water reactors AP1000 and improved M310

CHENG Jun, YANG Jianjun   

  1. (Hebei Branch of China Nuclear Power Engineering Company Limited, Shijiazhuang 050021, China)
  • Received:1900-01-01 Revised:1900-01-01 Online:2013-04-25 Published:2013-04-25

摘要: 以三代AP1000型与M310改进型压水堆核电站二回路给水系统为例,对给水泵调节阀组配置及主给水泵配置方式进行了比较,分析了AP1000型核电站二回路给水系统配置的优缺、点,为三代核电站的自主设计建造提供参考。

关键词: AP1000压水堆, M310压水堆, 二回路给水系统, 给水泵, 比较分析

Abstract: Taking the feed water systems in secondary loop of third generation AP1000 PWR and improved M310 PWR nuclear power plants as example, the configuration of the adjustment valve sets for feed water pump and the configuration of the main feed water pumps were compared. The advantages and disadvantages of the configuration of feed water system in secondary loop of the AP1000 nuclear power station were analyzed, which provides reference for independent design and construction of third generation nuclear power station.

Key words: pressurized water reactor AP1000 (AP1000 PWR), pressurized water reactor M310 (M310 PWR), feedwater system in secondary loop, feed water pump, comparative analysis