600MW超临界机组取消脱硫烟气旁路的技术分析

  

  1. (国投宣城发电有限责任公司,安徽宣城〓243000)
  • 出版日期:2013-07-25 发布日期:2013-08-20

Technical analysis on canceling of FGD bypass of 600MW supercritical unit

  1. (SDIC Xuancheng Power Generation Company Limited, Xuancheng 243000, China)
  • Online:2013-07-25 Published:2013-08-20

摘要:

摘要:介绍了国家的环保政策,分析了取消脱硫烟气旁路对机组的影响,论述了取消脱硫烟气旁路后的管理提升措施及技术应对措施,并举例进行了验证。

关键词: 关键词:烟气旁路, 脱硫, 管理提升, 技术措施

Abstract:

Abstract:The national environment protection policy was introduced. The influence of canceling of FGD bypass on the unit was analyzed. The management improvement measures and the technical countermeasures after canceling of FDG bypass were expounded and verified by examples.

Key words: Key words:flue gas bypass, desulphurization, management improvement, technical measure