华电技术 ›› 2014, Vol. 36 ›› Issue (11): 43-45.

• 研究与开发 • 上一篇    下一篇

110kV变电站备用电源自动投入保护拒动事故分析及处理

  

  1. (国网福州供电公司,福州〓350005)
  • 出版日期:2014-11-25 发布日期:2014-12-17

Analysis on rejecting act accident of automatic bus transfer equipments in an 110kV substation and treatment measures

  1. (Fuzhou Power Supply Company, Fuzhou 350005, China)
  • Online:2014-11-25 Published:2014-12-17

摘要: 摘要:针对某110kV变电站一起110kV线路故障跳闸时全站备用电源自动投入保护拒动事故,采用原理分析、逻辑验证的方法进行分析和探讨,提出在运行和维护中需要采取的防范措施。

关键词: 关键词:备用电源自动投入, 拒动, 技术措施

Abstract: Abstract:In an 110kV substation, when the 110kV line failed and relevant beaker tripped, the automatic bus transfer equipments of the substation did not act, and related transformer and 110kV bus were cutout. Using the theoretical analysis and logic verification method, the accident was analyzed and discussed. The preventive measures in operation and maintenance were pointed out. The results in this paper provide reference for design and operation of the automatic bus transfer equipments.

Key words: Keywords:automatic bus transfer equipment, rejecting act;technical measure