环保改造中厂用电系统调整方案的确定

  

  1. 天津军粮城发电有限公司,天津〓300300
  • 出版日期:2015-09-25 发布日期:2015-11-26

The determination of adjustment schemes of electrical auxiliary system for environment protection alteration

  1. Tianjin Junliangcheng Power Generation Company Limited, Tianjin 300300, China
  • Online:2015-09-25 Published:2015-11-26

摘要:

摘要:根据国家环保要求,天津军粮城发电有限公司对#5#10机组脱硫、脱硝系统进行改造,针对厂用电容量变化较大的情况,提出了2套改造方案并进行了分析及比选,最终得出结论并确定改造方案。

关键词: ">关键词:脱硫;脱硝;增容改造;厂用电;公用变压器

Abstract:

Abstract:According to the national environmental protection requirements, Tianjin Junliangcheng Power Generation Company Limited needs to
reconstruct the desulfurization and denitrification systems of No.5 to No.10 power units. Aimed at the condition of large variety of auxiliary power
capacity, this paper proposed two reconstruction schemes, compared the two schemes, and finally determined the reconstruction scheme.

Key words: Keywords:desulfurization, denitrification, capacity extension, auxiliary power, common transformer