600MW高硫煤机组脱硫单塔增容改造技术的应用

  

  1. 四川广安发电有限责任公司,四川广安〓638017
  • 出版日期:2016-02-25 发布日期:2016-04-15

Application of transformation technology of gapacity increase of single tower for desulfuration of 600MW high sulphur coal unit

  1. Sichuan Guangan Power Company Limited,Guangan 638017,China
  • Online:2016-02-25 Published:2016-04-15

摘要:

摘要:以某电厂600MW机组烟气脱硫系统进行的增容改造为例,介绍了高硫地区电厂脱硫系统为适应燃煤变化及国家排放要求而进行增容改造方案的比选情况,分析了在原脱硫系统的单吸收塔基础上进行增容改造的实施情况,为具有相同改造要求和相似改造环境的电厂提供参考案例。

关键词: 关键词:600MW机组, 高硫煤, 单塔脱硫, 增容改造

Abstract:

Abstract:Take capacity expansion reformation of flue gas desulphurization system of a certain 600MW unit as an example,this paper introduces comparison and selection of capacity expansion reformation of desulphurization in the high sulphur district in order to adapt to the change of sulfur content rate in coal and national emissions requirements.This paper also analysis the implementation of the original desulphurization system,which brings reference value to similar plant transformation.