火力发电厂现场总线调试分析

  

  1. 1.西安热工研究院有限公司,西安〓710032; 2.华能新疆轮台电厂,新疆巴音郭楞〓841000
  • 出版日期:2016-08-25 发布日期:2016-10-31

Analysis of fieldbus debugging for coal fired power plant

  1. 1.Xi’an Thermal Power Research Institute Company Limited,Xi’an 710032,China; 2.Huaneng Xinjiang Luntai Power Plant,Bayingolin 841000,China
  • Online:2016-08-25 Published:2016-10-31

摘要:

摘要:按照火力发电厂现场总线系统工程实施流程,分析了设计、组态、出厂验收、总线施工、单体调试等环节对现场总线调试的影响,指出了各个环节由于技术或组织管理不完备而导致的问题,并提出了相应的解决对策。

关键词:

Abstract:

Abstract:According to the implementation process of fieldbus system project of coalfired power plant, this paper analyzed the effects of operation processes on fieldbus debugging, such as design, configuration, leavefactory check and acceptance, bus construction and monomer debugging, etc., pointed out the problems that caused by technique or incomplete organization management in the processes, and proposed the corresponding countermeasures.

Key words: