华电技术 ›› 2011, Vol. 33 ›› Issue (3): 73-74.

• 节能与环保 • 上一篇    下一篇

600MW超临界机组脱硫系统石灰石浆液搅拌器基础部分改进

尹鹏飞   

  1. 广东珠海金湾发电有限公司,广东珠海519060
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-03-25 发布日期:2011-03-25

The improvement for the limestone slurry agitator base in desulfurization system of 600MW supercritical unit

YIN Pengfei   

  1. Guangdong Zhuhai Jinwan Power Generation Corporation Limited, Zhuhai 519060, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-03-25 Published:2011-03-25

摘要: 对广东珠海金湾发电有限公司 #3, #4机组脱硫系统石灰石搅拌器整体晃动事故进行了分析,找出了晃动的原因,提出了针对性的处理办法,从根本上解决了石灰石搅拌器整体晃动的问题,希望能对同类问题的解决提供帮助。

关键词: 脱硫系统, 浆液箱, 搅拌器, 晃动, 处理

Abstract: The rocking problem of whole limestone slurry agitator of the unit No.3 and No.4 desulfurization system in Guangdong Zhuhai Jinwan Power Generation Corporation Limited was analyzed, and the cause of rocking was found out, after implementing the pertinence measures, the rocking problem of the whole agitator was solved radically, hoping this experience can be a reference to solve the same problems.

Key words: desulfurization system, slurry tank, agitator, rock, treatment