华电技术 ›› 2012, Vol. 34 ›› Issue (6): 65-66.

• 技术交流 • 上一篇    下一篇

公用系统网络通信堵塞问题分析与解决

景磊,杨永尚   

  1. 华电内蒙古能源有限公司包头发电分公司,内蒙古包头014013
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-06-25

Analysis on congestion of public communication network and countermeasures

JING Lei, YANG Yongshang   

  1. Baotou Power Generation Branch of Huadian Inner Mongolia Energy Company Limited, Baotou 014013, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2012-06-25

摘要: 华电内蒙古能源有限公司包头发电分公司在对 #1, #2机组调用公用数据时,曾出现画面显示蓝点及响应慢的现象,通过现场检查并分析其公用系统通讯网络存在的问题,采取了调整控制器周期与相位及删减部分无用组态、降低厂级监控信息系统采集分散控制系统数据时间、减少 #1或 #2机组同时调用公用系统数等具体措施,有效降低了公用系统网络的通信负荷,为机组的安全、稳定运行奠定良好的基础。

关键词: 堵塞, 周期相位, 采集时间, 通信负荷

Abstract: In Baotou Power Generation Branch of Huadian Inner Mongolia Energy Company Limited, during public data calling process from the units No.1 and No.2, some blue points occurred on the picture, and the system response was slower. Based on field inspection and analysis of the problems existing in public communication network, some concrete measures were adopted, which include regulating the period and phase of the controller, deleting a part of useless configurations, reducing the data acquisition time of the plant level SIS from DCS, avoiding the units No.1 and No.2 to call public data at the same time and so on. The communication load of the public communication network was decreased effectively, which lays a good foundation for safe and stable operation of the units.

Key words: congestion, period and phase, acquisition time, communication load