华电技术 ›› 2012, Vol. 34 ›› Issue (8): 5-7.
• 专题综述 • 上一篇 下一篇
杨俊敬, 康立荣,朱庆华
收稿日期:
修回日期:
出版日期:
YANG Junjing, KANG Lirong, ZHU Qinghua
Received:
Revised:
Published:
摘要: 针对水闸、船闸等水工建筑物墩墙混凝土裂缝难以通过施工工艺有效控制的现状,通过对墩墙温度应力的计算分析,阐明了抗裂设计的必要性,探讨了抗裂暗梁的设计方法。工程实施结果表明,合理配置墩墙抗裂暗梁,可有效控制混凝土裂缝尤其是贯穿性裂缝的发生,是一种作用比较明显的抗裂设计措施。
关键词: 水工建筑物, 墩墙, 混凝土裂缝, 温度应力, 暗梁, 抗裂设计
Abstract: Aiming at the hard condition of effectively control in the concrete cracks of pier wall in hydraulic structure at the water gate, the ship lock and others. The necessity of the anticrack design was expounded, and the design method of the anticrack hidden beam was discussed by calculation and analysis of the temperature stress of the pier wall. The engineering implementation result shows that to configure pier wall hidden beam rationally can control the concrete cracks effectively in the penetrating cracks in especial .It is an anticrack design method with obvious effects.
Key words: hydraulic structure, pier wall, concrete crack, temperature stress, hidden beam, anti-crack design
杨俊敬;康立荣;朱庆华. 水工建筑物墩墙温度应力分析与抗裂暗梁的设计研究[J]. 华电技术, 2012, 34(8): 5-7.
YANG Junjing;KANG Lirong;ZHU Qinghua. Analysis on temperature stress of pier wall of hydraulic structure and research on design of anticrack hidden beam[J]. Huadian Technology, 2012, 34(8): 5-7.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.hdpower.net/CN/
https://www.hdpower.net/CN/Y2012/V34/I8/5