华电技术 ›› 2012, Vol. 34 ›› Issue (8): 8-9.
• 专题综述 • 上一篇 下一篇
焦兴平
收稿日期:
修回日期:
出版日期:
JIAO Xingping
Received:
Revised:
Published:
摘要: 对于设计有水轮机进水阀的水电站,进水阀能否快速安装完成是决定水电站能否提前发电的重要因素之一。根据施工经验,提出了快速安装进水阀的方法,通过实施,达到了预期目标。
关键词: 水电站, 水轮机, 进水阀, 快速安装, 工艺流程, 施工工期
Abstract: For the hydropower station with the water turbine inlet valve in its design, whether the inlet valve can be installed quickly is one of important factors determining that whether the hydropower station can generate electricity ahead of time. Based on the experiences of construction, a fast installation method of the inlet valve was proposed. The method had been used in practice, and the anticipated goal was achieved.
Key words: hydropower station, water turbine, inlet valve, fast installation, process flow, construction period
焦兴平. 一种水轮机进水阀的快速安装方法[J]. 华电技术, 2012, 34(8): 8-9.
JIAO Xingping. A fast installation method of water turbine inlet valve[J]. Huadian Technology, 2012, 34(8): 8-9.