摘要:近年来,世界各国都提高了对电力系统可靠性的要求,要求机组具备快速甩负荷(FCB)功能,能孤岛可靠运行且再并网成功。以越南某电厂622MW机组为例,介绍了汽轮机转速、汽轮机旁路、汽包水位的控制策略,分析并解决了机组FCB过程中存在的问题,保证了机组正常运行并具备再并网能力。

关键词:

Abstract:

Abstract:In recent years, all countries in the world improve the requirements of power system reliability, which are the power unit should have the fast cut back (FCB) function, and meanwhile it could run reliably in islanded mode and have the capability of grid reconnection. Taking the 622MW power unit of a certain power plant in Vietnam as an example, this paper introduced the optimized control strategies of the turbine speed, turbine bypass and drum water level, analyzed and solved the problems that existed in the FCB process of power unit, which ensured the normal operation and the gridreconnection capability of power unit.

Key words: