摘要:

为满足智能变电站小型化建设的要求,针对预制舱内二次设备的特点和使用习惯,提出了一种“前接线、前显示”二次设备结构形式,其可实现二次设备的板前安装、板前接线、板前操作。其用于舱内,可最大化利用舱内空间,减少变电站占地面积,推动智能变电站小型化建设的发展。

关键词:

Abstract:

In order to meet the construction requirements of intelligent substation,considering the characteristic and using habit of secondary device in prefabricated cabin, it proposes  a new structural form of secondary device called ‘foreside wiring and foreside display’. It makes secondary device’s installing, wiring and operating in front of panel realizable. Using this in cabin, the space of prefabricated cabin can be maximize, the floor space of intelligent substation can be reduced. In that case, this form could impel the miniaturization of intelligent substation.

Key words: