Huadian Technology ›› 2008, Vol. 30 ›› Issue (12): 75-77.
• 节能与环保 • Previous Articles Next Articles
FAN Yanxia1, ZENG Hui1, ZHANG Hua1, WANG Jite2
Received:
Revised:
Published:
Abstract: In retrofitting project of wet FGD for coalfired power plants, the original stack need to be upgraded for corrosion resistance due to that the GGH will be eliminated. In order to avoid its influence to the operation of main units, it is necessary to construct a temporary stack. In this article, two methods for construction of temporary stack widely used in actual projects were introduced, and the methods can also be used as good reference for similar project.
Key words: wet flue-gas desulphurization, technical reformation project, gas-gas heater (GGH), stack anticorrosion, temporary stack
FAN Yanxia;ZENG Hui;ZHANG Hua;WANG Jite. Design of temporary stack for retrofitting project of wet FGD[J]. Huadian Technology, 2008, 30(12): 75-77.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2008/V30/I12/75