Huadian Technology ›› 2008, Vol. 30 ›› Issue (3): 67-69.
• 节能与环保 • Previous Articles Next Articles
WANG Dong-chuan, MA Li-guo
Received:
Revised:
Published:
Abstract: the boiler structure and their main operation parameters are introduced. Some problems in starting and stopping process needed to pay attention to has been pointed out. The measures to improve the EP efficiency and prevent heating surface from abrasion as well as boiler from slagging have been presented based on the operation experience .
Key words: CFB boiler, economical operation, adjustment measure
WANG Dong-chuan;MA Li-guo. Analysis on economic operation of 480t/h CFB boiler[J]. Huadian Technology, 2008, 30(3): 67-69.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2008/V30/I3/67