Huadian Technology ›› 2008, Vol. 30 ›› Issue (7): 6-8.
• 专题综述 • Previous Articles Next Articles
PENG Xiao-zheng1, CHEN Nian-zu2, CHENG Wen-feng1
Received:
Revised:
Published:
Abstract: The problems revealed during erection, trial operation and trial production of the first home-made CFB boiler were introduced. The adoption of successful experience, the improvement of fluidized bed heat exchanger (FBHE), the measures for prevention of explosive combustion and furnace clinkering were expounded in detail, and the useful practical experience for construction of 1025t/h CFB boiler and other CFB boilers was afforded.
Key words: circulating fluidized bed (CFB), improvement, experience
PENG Xiao-zheng;CHEN Nian-zu;CHENG Wen-feng. The First Home-made 670t/h CFB Boiler and Its Operation Experience[J]. Huadian Technology, 2008, 30(7): 6-8.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2008/V30/I7/6
Application of acoustic blockage removal technique applied in urea pyrolysis furnaces
Derating and efficiency optimization operation of wind turbines running above cutout wind speed