Huadian Technology ›› 2009, Vol. 31 ›› Issue (1): 21-22.
• 专题综述 • Previous Articles Next Articles
ZHOU Yuling,ZHENG Xiaoqin
Received:
Revised:
Published:
Abstract: Smooth drainage of collecting well in hydropower station is important to ensure the station normal operation. The problems existed in collecting well of a hydropower station were analyzed, the technical reformation was accomplished by combining the conventional control system of the power station with computer control system, and excellent economic benefit was obtained.
Key words: hydropower station, collecting well, automatic control, reformation
ZHOU Yuling;ZHENG Xiaoqin. Improvement measure of pump water control device of collecting well in hydropower station[J]. Huadian Technology, 2009, 31(1): 21-22.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2009/V31/I1/21
Operation region partition for hydraulic turbine generator units based on stability test data
Stress test and analysis of submerged radial gate structure of hydropower station