Huadian Technology ›› 2009, Vol. 31 ›› Issue (11): 26-29.
• 研究与开发 • Previous Articles Next Articles
CHEN Xiaoan
Received:
Revised:
Published:
Abstract: The slag chunks were formed and fell off frequently in the boiler of 1000MW unit of Zouxian Power Plant of Huadian Power International Corporation Limited, and these caused some accidents such as the emergency door of the slagoff machine was opened by bulge force, the water seal of boiler was lost, etc. After reducing load at night, the sound had be often listened which was caused by big slag chunks falling, and obvious vibration can be felt in central control room, and the safety and stable operation of the unit had been influenced seriously. Combining with practical situation, the slagging reasons of the 1000MW boiler were analyzed, and concrete preventing measures were proposed.
Key words: boiler slagging, combustion adjustment, solving measures
CHEN Xiaoan. Reason analysis and prevention measures of boiler slagging in 1000MW unit[J]. Huadian Technology, 2009, 31(11): 26-29.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2009/V31/I11/26
Retrofit and combustion adjustment of a lownitrogen burner in a 330MW cogeneration unit