Huadian Technology ›› 2009, Vol. 31 ›› Issue (11): 53-55.

• 技术交流 • Previous Articles     Next Articles

The reason analysis about output transmission line breaking fault in a hydropower plant and countermeasures

LUO Hexu   

  1. Fujian Huadian Investment Corporation Limited, Fuzhou 350003, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-11-25 Published:2009-11-25

Abstract: According to the investigation of 110kV output transmission line breaking fault in Baisha Hydropower Plant, the fault process was introduced, the main reasons of line breaking were analyzed, and the probability of lightning strike of two wires simultaneously in 30s after discharge caused by windage yaw was discussed. It is pointed out that must adopt relevant prevention measures based on the microtopography, the microclimate of the transmission line location and various disastercausing factors.

Key words: transmission line, flashover caused by windage yaw, line breaking, micro-topography, lightning strike