Abstract: For the 600MW supercritical units with boiler with dryash furnace of Huaian Xiangfan Power Generation Corporation Limited,there are no slag well and shut down valve at the furnace bottom, the water seal at the bottom has to be destroyed and the slag has to be discharged when the ashconveyor was breakdown, otherwise the boiler has to be shutdown for overhauls. Summing up the experiences and lessons of the former failures, the counter measures were developed, it has been avoided to boiler overtemperature and MFT in the ashconveyor faults.
Key words: 600MW supercritical boiler, destroy water seal, ash-conveyor failure, countermeasure
LIU Xiaojun;XIAO Lizheng. Countermeasures for ashconveyor faults treatment by destructing water seal in 600MW supercritical boiler[J]. Huadian Technology, 2009, 31(3): 11-13.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2009/V31/I3/11