Huadian Technology ›› 2009, Vol. 31 ›› Issue (4): 1-3.
• 专题综述 • Next Articles
MA Shidong
Received:
Revised:
Published:
Abstract: At the startup process during commissioning period of No.1 600MW supercritical units in Anhui Huadian Suzhou Power Generation Corporation Limited, the problem of little overtemperature of the main steam occurred many times, especially in the first time of parallel in power grid. The main reasons were the small burning heat load, too much air flow and fuel, larger feedwater flow, unreasonable designs of attemperating water. In these regard, the series of measures were adopted, such as lowering the feedwater quantity during ignition, reducing fuel input, improving combustion, increasing combustion heat load, controlling the negative pressure of furnace at -100Pa, the total air flow of 0.5 ~ 0.6 million m3/h, and raising feedwater temperature above 100℃,etc. the problem of overtemperature of main steam during initial stage of startup process has been solved, and all the parameters have reached designed demands.
Key words: supercritical unit, once-through boiler, start up commissioning, steam temperature change, adjustment measure
MA Shidong. The causes analysis on overtemperature of main steam of supercritical oncethrough boiler at initial stage of startup[J]. Huadian Technology, 2009, 31(4): 1-3.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2009/V31/I4/1