Design optimization of emergency power supply for flue gas desulphurization in 330MW unit

WANG Xiaodong1,MA Junbiao2,ZENG Guanghua2,MA Jianping3,HU Xiankuang3   

  1. 1.Central Southern China Electric Power Design Institute,Wuhan 430071, China; 2.China Huadian Engineering Corporation Limited,Beijing 100044, China; 3.Hubei Xisaishan Power Generation Corporation Limited,Huangshi,435001 China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-05-25 Published:2009-05-25

Abstract: The FGD system was not built in some operated power plant. Therefore, the connection between emergency load of FGD and power supply had not be considered in the design of those power plant, and this leads many difficulties for design of FGD emergency power supply in FGD reformation of those power plant. The design optimization process of FGD emergency power supply for 2×330MW units in Hubei Xisaishan Power Generation Corporation Limited was analyzed. The optimization provides a thought for emergency power supply design of FGD reformation in operated power plant, and this solution can be used as reference for similar project.

Key words: flue gas desulphurization (FGD), emergency power supply, design optimization