Abstract: The exploring works of plant SIS construction in stages in Hunan Huadian Changsha Power Generation Corporation Limited were introduced. It is pointed out that for a successful SIS construction, the first stage is to construct the fundamental function of the SIS, and the advanced function of SIS should be developed in following-up stages. The informatization direction of power plant was investigated.
Key words: plant supervisory information system (SIS), construction in stages, advanced function, informatization direction
HUANG Qiang. Investigation of plant SIS construction in stages and informationization[J]. Huadian Technology, 2009, 31(5): 67-70.