Huadian Technology ›› 2011, Vol. 33 ›› Issue (11): 41-43.
• 技术交流 • Previous Articles Next Articles
YANG Ke
Received:
Revised:
Published:
Abstract: In 380V auxiliary power system of the 300MW unit of Sichuan Guang′an Power Generation Company Limited project phase I, the configuration of some low voltage distribution equipments, such as PC, MCC and power inlet switches, was not rational, which formed hidden safety danger for the operation of the unit and its auxiliary equipments when a fault of the auxiliary power occurred. The hidden danger and hazard existing in the 380V auxiliary power system of the unit were analyzed; the optimization scheme was put forward; and safety power supply of the auxiliary power system of the unit was ensured.
Key words: auxiliary power system, distribution equipment, hidden danger and hazard, optimization scheme
YANG Ke. Optimization of 380V auxiliary power systemYANG Ke[J]. Huadian Technology, 2011, 33(11): 41-43.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I11/41
Optimization design for electrical control systems in gas distributed energy stations