Huadian Technology ›› 2011, Vol. 33 ›› Issue (8): 1-4.
• 专题综述 • Next Articles
YU Huiqing
Received:
Revised:
Online:
Published:
Abstract: The reasons of reformation of unit No.5 in Hunanzhen Hydropower Station for vibration attenuation and capacity expansion were introduced. The implementation of the reformation for vibration attenuation and capacity expansion of unit No.5 was expounded. The test and operation results of reformed unit No.5 of Hunanzheng Hydropower Station show that the reformation is very successful; and the technical data of the unit were reached expected value of the capacity expansion reformation.
Key words: hydroelectric generating set, vibration attenuation, capacity expansion, technical reformation
YU Huiqing. Reformation of unit No.5 in Hunanzhen Hydropower Station for vibration attenuation and capacity expansion[J]. Huadian Technology, 2011, 33(8): 1-4.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I8/1