Huadian Technology ›› 2012, Vol. 34 ›› Issue (11): 29-31.
• 技术交流 • Previous Articles Next Articles
ZHOU Yang
Received:
Revised:
Published:
Abstract: For the install position of the 220kV metal zinc oxide arrester (MOA) is higher from the earth, in maintenance and preliminary test of MOA, larger amount of work must be spent to demolish the lead wires and this causes certain risk. A new test method was developed, in which to demolish the lead wires is not needed. To use the new method can lighten working strength, shorten working time and reduce the risk of persons and equipments. The theoretical feasibility and practically measured data of the new test method used in test of 220kV MOA were analyzed; and the analysis shows that the practically data of the MOA measured by the new method is comparable with the data measured by original method, in which the lead wires of MOA must be demolished; and the new test method can satisfy the requirement of relative regulations.
Key words: metal zinc oxide arrester, maintenance and preliminary test, without need to demolish lead wires, current leakage, feasibility
ZHOU Yang. Test method of 220kV zinc oxide arrester without need to demolish lead wires[J]. Huadian Technology, 2012, 34(11): 29-31.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/I11/29