Huadian Technology ›› 2012, Vol. 34 ›› Issue (12): 49-50.
• 技术交流 • Previous Articles Next Articles
WANG Xiaozhu1,LI Xiangling2,DUANMU Yanfeng1,WANG Shuchun2,ZHAO Xinpu2,JIANG Shoukun2,LI Shuguang2
Received:
Revised:
Online:
Published:
Abstract: In order to satisfy the heating demands of the Zoucheng city, the 2×335MW straight condensing unit of Zouxian Power Plant was reformed into heat supplying unit. The steam extraction for heatsupply is led out from the steamguide tube between medium pressure cylinder and low pressure cylinder to the initial station of heat supply network. The initial station of heat supply network was built in plant area and connected with the heat supply piping network of Zoucheng city through the heat supply piping new built in plant area. After the reformation, favorable social effects and economical benefit were obtained.
Key words: 335MW straight condensing unit, heat-supply reformation, steam-guide tube, initial station of heat supply network, heat rate
WANG Xiaozhu;LI Xiangling;DUANMU Yanfeng;WANG Shuchun;ZHAO Xinpu;JIANG Shoukun;LI Shuguang. Heatsupply reformation of 335MW straight condensing unit in Zouxian Power Plant[J]. Huadian Technology, 2012, 34(12): 49-50.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/I12/49
Evaluation of prefilter improvement effect of gas turbine air intake filtration system