The main technical parameters of stator of the ALSTOMmade unit installed in the Three Gorges Left Bank Hydropower Station were introduced. The
test items and test standards of the stator whole withstanding voltage test and the cooling water system test were put forward; the test sequence and the
concrete implementation plans of different tests were drawn up; and some security matters were pointed out.
Key words: stator winding, electrical test, cooling water system, testing program, security matters
SHENG Guolin. Stator whole withstanding voltage test and cooling water system test of an ALSTOMmade unit[J]. Huadian Technology, 2012, 34(2): 34-35.