Debugging of supercritical oncethrough boiler of 660MW unit

CHEN Hui, LIU Shihui, HUANG Qilong, WANG Sheng, LI Chaobing   

  1. Guodian Research Institute of Science and Technology, Nanjing 210031, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-05-25 Published:2012-05-25

Abstract: The design features of the newbuilt 2×660MW supercritical oncethrough boiler of a power plant and the debugging situation of the boiler were introduced. The problems occurred in boiler debugging process were summarized; the reasons of the problems were analyzed, and the methods for solving these problems were proposed, which provides reference for debugging of supercritical oncethrough boiler.

Key words: supercritical once-through boiler, debugging, fan, plasma