Abstract: The design features of the newbuilt 2×660MW supercritical oncethrough boiler of a power plant and the debugging situation of the boiler were introduced. The problems occurred in boiler debugging process were summarized; the reasons of the problems were analyzed, and the methods for solving these problems were proposed, which provides reference for debugging of supercritical oncethrough boiler.
Key words: supercritical once-through boiler, debugging, fan, plasma
CHEN Hui;LIU Shihui;HUANG Qilong;WANG Sheng;LI Chaobing. Debugging of supercritical oncethrough boiler of 660MW unit[J]. Huadian Technology, 2012, 34(5): 1-3.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/I5/1
Experiment on energy saving optimization test of desulfurization and oxidation fans for 350MW units
Design and application of intelligent auxiliary debugging system for largescale energy storage power station