Aiming at serious boiler slagging and extinguishing of the 300MW subcritical unit in a power plant, combining with the boiler structure features,
the coal characteristics and the actual operation situation, the main reasons causing the boiler slagging were analyzed. Some targeted control measures for
preventing the boiler slag falling and extinguishing, such as the coal management, the oxygen adjustment and others, were proposed. After the measures
adopted, obvious slagging of the boiler was eliminated; and favorable effect of the control measures was obtained.
Key words: slagging, fire extinguishing, refractory belt, leveling of primary air
YIN Qingdong;LIU Wenxian;WEI Gang;WEI Yingli;LIU Binjie. Reason analysis and treatment measures of boiler slagging and fire extinguishing of 300MW unit[J]. Huadian Technology, 2012, 34(5): 45-47.