Huadian Technology ›› 2013, Vol. 35 ›› Issue (10): 10-14.
Previous Articles Next Articles
Published:
Abstract: Abstract:Secondary disasters will occur inevitably after power outage in whole plant scope, so to implement black start quickly is of important significance for a power plant. The correct selection of black start supply is the foundation of successful blackstart. Aiming at the tripout accident of three of the four output transmission lines of Togtoh Power Generation Company Limited at November 2012 caused by extreme weather, a optimized design of blackstart power supply system was carried out, in which the selection of the power source place, the protection configuration, the operation mode, the fivepreventing system, the electric energy metering system and others were considered. After the scheme was implemented in Togtoh Power Generation Company Limited, the blackstart was realized successfully and effectively, and favorable economic benefit and social effect were obtained.
Key words: Key words:black start power supply, protection device, fivepreventing system, electric energy metering system, dual power supply, optimized design
WANG Huifeng. Optimized design of black start power supply of Togtoh Power Generation Company Limited and application[J]. Huadian Technology, 2013, 35(10): 10-14.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I10/10
Design and implementation of a universal display terminal for protection devices