Emergency treatment measures of 600MW unit of Togtoh Power Generation Company Limited after its output line tripped

  

  1. (Inner Mongolia Datang International Togtoh Power Generation Company Limited, Togtoh 010206, China)
  • Published:2013-10-25

Abstract: Abstract:Combining with the tripout accident of three 500kV output lines of Togtoh Power Generation Company Limited, the measures to quick recover the common service system operation and to ensure the auxiliary steam supply after the 500kV output line of the 600MW units of the company all tripped were introduced. The key points and operating steps in treating of this kind of accidents were emphasized. It was pointed out that after the 500kV output lines all tripped, to depend on the power units of Hohhot Thermal Power Company Limited is the necessary method to ensure the units of Togtoh Power Generation Company Limited to stop safely and to avoid the main and auxiliary devices damage accident.

Key words: Key words:500kV output transmission line, trip, companywide auxiliary power outage, common service system, auxiliary steam