Analysis on treatment of “11.5” output line tripout accident of Togtoh Power Generation Company Limited

  

  1. (Inner Mongolia Datang International Togtoh Power Generation Company Limited, Togtoh 010206, China)
  • Online:2013-10-25 Published:2013-11-25

Abstract: Abstract:At November 5, 2012, three output transmission lines of Togtoh Power Generation Company Limited tripped successively. Aiming at this accident, the measures to ensure the supply of auxiliary steam after the units shut down were analyzed, and the matters needing attention in unit stopping were put forward, which ensure the units to operate safely and stably.

Key words: Key words:blizzard, power transmission line, tripout accident, auxiliary steam, auxiliary power