Huadian Technology ›› 2013, Vol. 35 ›› Issue (10): 46-48.
Previous Articles Next Articles
Published:
Abstract: Abstract:Extreme rain and snow weather occurred at the winter of 2012, and this caused three 500kV output transmission lines of Togtoh Power Generation Company Limited tripped successively. The operation mode of companywide units before the lines tripped and the treatment process of the line tripout accident were introduced. The measures to ensure the units to stop safely and orderly and to prevent the auxiliary power system and auxiliary steam system to be all failure after partial or all 500kV output lines tripped were discussed, which are helpful to avoid damage of unit equipments.
Key words: Key words:line tripping, auxiliary power system, safe shutdown, emergency power supply, emergency plan
NIU Youlong. Safe shutdown scheme of power units after 500kV output line tripped[J]. Huadian Technology, 2013, 35(10): 46-48.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I10/46
Optimization design for electrical control systems in gas distributed energy stations