Operating methods of power unit No.5 in output line tripout accident treatment of Togtoh Power Generation Company Limited and envisioning

  

  1. (Inner Mongolia Datang International Togtoh Power Generation Company Limited, Togtoh 010206, China)
  • Online:2013-10-25 Published:2013-11-25

Abstract: Abstract:At November 5, 2012, the output transmission lines of Togtoh Power Generation Company Limited tripped. The operating process of power unit No.5 was analyzed. In order to ensure safe and stable operation of unit No.5, the accident treatment scheme was evaluated, and some possible accident developments and relevant countermeasures were envisioned.

Key words: Key words:output transmission line, trip, auxiliary power, accident envisioning, treatment