Abstract: Abstract:At November 5, 2012, the output transmission lines of Togtoh Power Generation Company Limited tripped. The operating process of power unit No.5 was analyzed. In order to ensure safe and stable operation of unit No.5, the accident treatment scheme was evaluated, and some possible accident developments and relevant countermeasures were envisioned.
Key words: Key words:output transmission line, trip, auxiliary power, accident envisioning, treatment
DING Zhihua. Operating methods of power unit No.5 in output line tripout accident treatment of Togtoh Power Generation Company Limited and envisioning[J]. Huadian Technology, 2013, 35(10): 52-53.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I10/52
Optimization design for electrical control systems in gas distributed energy stations
Study of aeroderivative gas turbines applied in industrial park integrated energy systems