Abstract: Abstract:A heavy snow suddenly occurred in a north region, and this caused the transmission line tripout accidents of YuanAn Line I and two YuanBa lines. Only the YuanAn Line II remained in working condition, and the unit No.4 and unit No.8 still were operating with 300MW load. Togtoh Power Generation Company Limited quickly organized related professionals, started the emergency plan, and adopted effective preventive measures, which ensured the remained units to operate safely and stably.
Key words: Key words:“11.5” accident, power grid line fault, preventive measure
CHEN Lei, WANG Kaimin, LONG Junfeng. Preventive measures of thermal control system during power grid line fault treatment[J]. Huadian Technology, 2013, 35(10): 74-75.