Huadian Technology ›› 2013, Vol. 35 ›› Issue (2): 50-53.
• 技术交流 • Previous Articles Next Articles
ZANG Xudong
Received:
Revised:
Online:
Published:
Abstract: Taking the 300MW unit of Wangting Power Plant, which was put into operation in the 1990s , as example, the problems existed in DCS, such as that the devices were aged, the reliability of the system was lowered, the standby circuit cards supply was halted and so on, were analyzed. The reformation scheme of the DCS and the concrete implementation process during the unit overhaul in 2010 were introduced. The successful experiences obtained in DCS reformation processes, which included the software function optimization, the digital electrohydraulic control program porting, the construction debugging and others, were summarized. Aiming at the encountered problems, the solutions were proposed, which can be used as reference for similar units in DCS upgrade reformation.
Key words: thermal power plant, distributed control system (DCS), WDPF system, Ovation system, code conversion, graphics conversion, database conversion, upgrade reformation
ZANG Xudong. Upgrade reformation of distributed control system from WDPF system into Ovation system[J]. Huadian Technology, 2013, 35(2): 50-53.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I2/50
Fault analysis on desulfurization DCS signal interference in a thermal power plant
Quality evaluation and performance analysis of WC9 cast steel safety valve for inservice units in a thermal power plant
Experimental study on electrochemical technology for circulating water treatment in thermal power plant