Huadian Technology ›› 2013, Vol. 35 ›› Issue (3): 35-37.

• 技术交流 • Previous Articles     Next Articles

Analysis on limitation of deterministic dynamic programming method in solving problem of power generation optimization of cascade hydropower plants

LIU Shulin1, XIAO Yan2   

  1. (1.Sales Dept of China Huadian Corporation, Beijing 100031, China; 2.Guizhou Wujiang Hydropower Development Company Limited, Guiyang 550002, China)
  • Received:1900-01-01 Revised:1900-01-01 Online:2013-03-25 Published:2013-03-25

Abstract: The deterministic dynamic programming method is often used in domestic production practice to solve the problem of optimized dispatch of cascade hydropower plants. The problems of the deterministic dynamic programming method in solving cascade power generation optimized dispatch caused by the limitation of the method itself were analyzed. The deterministic dynamic programming method is of certain guiding significance for seeking cascade medium and long term power generation optimal dispatch strategy and the power generation plan analysis, however, it is not suitable to solve the problem of shortterm power generation dispatch optimization.

Key words: deterministic dynamic programming method, cascade power generation, optimized dispatch, limitation