Abstract: The flue gas desulphurization equipment without bypass of thermal power plant operates simultaneously with the main power generation unit, and the desulphurization electrical system is identical in importance with the electrical system in the main power house. The conventional desulphurization electrical system for FGD system with bypass is difficult to satisfy the requirement in reliability and continuity of the power supply. The design of electrical system for FGD system without bypass was expounded in detail, and the design features of the desulphurization electrical systems for the system with bypass and the system without bypass were compared, which provides reference for the persons of the same profession.
Key words: thermal power plant, bypass, flue gas desulphurization (FGD), electrical system
XIN Shouliang. Electrical system design for flue gas desulphurization system without bypass of thermal power plant[J]. Huadian Technology, 2013, 35(3): 70-73.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I3/70
Fault analysis on desulfurization DCS signal interference in a thermal power plant
Quality evaluation and performance analysis of WC9 cast steel safety valve for inservice units in a thermal power plant
Experimental study on electrochemical technology for circulating water treatment in thermal power plant