Huadian Technology ›› 2013, Vol. 35 ›› Issue (4): 72-75.
• 新能源 • Previous Articles
ZHANG Sicheng,XU Jiang
Received:
Revised:
Published:
Abstract: In the AP1000 nuclear power plant, the protection and safety monitoring system (PMS) is a safety I&C system, which is designed based on the Common Q platform. Before the plant is put into operation, in order to ensure the PMS can satisfy the designed system function requirement, using the overlap test method, the PMS preoperational test was carried out. Combining with the structure and function of PMS, the PMS preoperational test was introduced and analyzed in this paper, which can be used as reference for preoperational test.
Key words: AP1000 nuclear power plant, protection and safety monitoring system (PMS), pre-operational test, over-lap test, analysis
ZHANG Sicheng;XU Jiang. Analysis on preoperational test of protection and safety monitoring system of AP1000 nuclear power plant[J]. Huadian Technology, 2013, 35(4): 72-75.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I4/72