Analysis on preoperational test of protection and safety monitoring system of AP1000 nuclear power plant


ZHANG Sicheng,XU Jiang   

  1. (CNNC Sanmen Nuclear Power Company Limited, Sanmen 317112, China)
  • Received:1900-01-01 Revised:1900-01-01 Online:2013-04-25 Published:2013-04-25

Abstract: In the AP1000 nuclear power plant, the protection and safety monitoring system (PMS) is a safety I&C system, which is designed based on the Common Q platform. Before the plant is put into operation, in order to ensure the PMS can satisfy the designed system function requirement, using the overlap test method, the PMS preoperational test was carried out. Combining with the structure and function of PMS, the PMS preoperational test was introduced and analyzed in this paper, which can be used as reference for preoperational test.

Key words: AP1000 nuclear power plant, protection and safety monitoring system (PMS), pre-operational test, over-lap test, analysis