Abstract: A longer delay occurred during the dynamic transmission process of the steam turbine master protection of a thermal power plant. The abnormal situation was analyzed, and the reason of the anomaly was determined. The corresponding measures were adopted, and similar incident is avoided.
Key words: master protection of seam turbine, delay of tripping, analysis of anomaly, measure
AN Jianxiong;GAO Qidong;ZHANG Shun. Analysis on reason of abnormal longer delay of protective tripping of steam turbine and treatment[J]. Huadian Technology, 2013, 35(5): 54-55.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I5/54
Research on gas turbine combustion pressure fluctuation and the key technologies for its measurement
Experimental study of dissolved oxygen’s effect on dissolved hydrogen analyzer of the main steam
Reasons analysis for tube blasting and preventive measures for superheater of 1000MW supercritical boiler
Research on automatic and seamless switching technology for virtual backup measurement and control units in smart substations