Huadian Technology ›› 2013, Vol. 35 ›› Issue (6): 42-44.

Previous Articles     Next Articles

Quality control for establishment of technical standard systematic frame of AP1000 construction and commissioning

  

  1. (State Nuclear Power Engineering Company Limited, Shanghai 200233, China)
  • Online:2013-06-25 Published:2013-07-23

Abstract:

Abstract:The factors influencing on quality of technical standard systematic frame of AP1000 construction and commissioning were analyzed. According to the analysis result, the quality control objects in the establishment process of the technical standard systematic frame were determined. Some concrete quality control measures were formulated, and the scientificalness and applicability of the technical standard systematic frame were ensured.

Key words: Key words:AP1000, technical standard, systematic frame, quality control, construction and commissioning