Huadian Technology ›› 2013, Vol. 35 ›› Issue (6): 5-9.

Previous Articles     Next Articles

Prophase investigation and analysis on fuel resource for biomass power plant

  

  1. (Guoneng Biomass Power Generation Group Company Limited, Beijing 100083, China)
  • Online:2013-06-25 Published:2013-07-23

Abstract:

Abstract:The investigation method of prophase investigation on fuel resource for biomass power plant were summarized.The basic situation of the earmarked biomass power plant site and peripheral area and the production and utilization of various biomass fuels were investigated. The cost and economic performance of various biomass fuels were analyzed. The future development tendency of various biomass fuels was predicted.

Key words: Key words:biomass power plant, fuel resource investigation, investigation method, purchasing storage and transport of fuel, economic evaluation