Huadian Technology ›› 2013, Vol. 35 ›› Issue (7): 36-37.

Previous Articles     Next Articles

Technical analysis on canceling of FGD bypass of 600MW supercritical unit

  

  1. (SDIC Xuancheng Power Generation Company Limited, Xuancheng 243000, China)
  • Published:2013-07-25

Abstract:

Abstract:The national environment protection policy was introduced. The influence of canceling of FGD bypass on the unit was analyzed. The management improvement measures and the technical countermeasures after canceling of FDG bypass were expounded and verified by examples.

Key words: Key words:flue gas bypass, desulphurization, management improvement, technical measure