Huadian Technology ›› 2013, Vol. 35 ›› Issue (7): 61-63.

Previous Articles     Next Articles

Chemical supervision of startup process of 350MW supercritical once through boiler

  

  1. (Datang Linzhou Thermal Power Company Limited, Linzhou 456500, China)
  • Online:2013-07-25 Published:2013-08-20

Abstract:

Abstract:Combining with startup process of 2×350MW supercritical once through boiler of Datang Linzhou Thermal Power Company   Limited,  the preparation work before unit startup and the requirements of chemical supervision in each period during startup process were summarized. Some problems needing attention in chemical supervision of startup process of 350MW supercritical unit were emphasized.

Key words: Key words:supercritical, once through boiler, startup process, chemical supervision