Abstract:The defects in design of the turbine emergency trip system (ETS) of Hubei Xisaishan Power Generation Company Limited were introduced. The measures of hardware upgrade and reformation were adopted, and the configuration was optimized. The design defects were eliminated, and the safety and the reliability of the turbine emergency trip system were improved.
Key words: Key words:steam turbine, emergency trip system (ETS), potential safety hazard, upgrade and reformation, software optimization
LIU Bei. Upgrade and reformation of emergency trip system of 330MW unit turbine[J]. Huadian Technology, 2013, 35(8): 4-5.