Huadian Technology ›› 2014, Vol. 36 ›› Issue (1): 54-57.
Previous Articles Next Articles
Published:
Abstract: Abstract:The leakage statistics of “four pipes” of HG-1021/18.2-YM4 type boiler and HG-1795/26.15-YM1 type boiler in Liaoning Huadian Tieling Power Generation Company Limited were given. Various factors causing leakage of “four pipes” and the development trend of the health of heating surfaces were analyzed. The concrete measures to prevent the leakage of “four pipes” were proposed.
Key words: Keywords:boiler, heating surface, leakage of “four pipes”, preventive measure
ZHENG Yonglu, AO Xiang. Analysis on heating surface leakage of “four pipes” of boiler and preventive measures[J]. Huadian Technology, 2014, 36(1): 54-57.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2014/V36/I1/54
Reasons analysis for tube blasting and preventive measures for superheater of 1000MW supercritical boiler